1.
Koo C, Hong T, Kim S. An integrated multi-objective optimization model for solving the construction time-cost trade-off problem. JCEM [Internet]. 2015Feb.26 [cited 2024Nov.15];21(3):323-3. Available from: https://transport.vgtu.lt/index.php/JCEM/article/view/2971