1.
Lee M, Lee U-K. A framework for evaluating an integrated BIM ROI based on preventing rework in the construction phase. JCEM [Internet]. 2020May7 [cited 2024Nov.15];26(5):410-2. Available from: https://transport.vgtu.lt/index.php/JCEM/article/view/12185