Cho, D., Cho, H., & Kim, D. (2014). Automatic data processing system for integrated cost and schedule control of excavation works in NATM tunnels. Journal of Civil Engineering and Management, 20(1), 132-141. https://doi.org/10.3846/13923730.2013.801907