[1]
Fonseca, F.B. da, Vanalle, R.M. and Camarotto, J.A. 2018. Identification of ex-ante and ex-post transaction costs in industrial construction engineering projects. Journal of Civil Engineering and Management. 24, 5 (Sep. 2018), 424-436. DOI:https://doi.org/10.3846/jcem.2018.5199.