[1]
Lee, C. and Won, J. 2021. Analysis of construction productivity based on construction duration per floor and per gross area, with identification of influential factors. Journal of Civil Engineering and Management. 27, 3 (Mar. 2021), 203-216. DOI:https://doi.org/10.3846/jcem.2021.14514.