Vol 28 No 4 (2022)
Published: 2022-03-08
Articles
Effective allocation of manpower in the production of precast concrete elements with the use of metaheuristics
Abstract 1592 | PDF Downloads 791 | DOI https://doi.org/10.3846/jcem.2022.16383
Page 247–260
Modeling of pavement roughness utilizing artificial neural network approach for Laos national road network
Abstract 1809 | PDF Downloads 900 | DOI https://doi.org/10.3846/jcem.2022.15851
Page 261–277
Automatic identification and quantification of safety risks embedded in design stage: a BIM-enhanced approach
Abstract 1862 | PDF Downloads 1005 | DOI https://doi.org/10.3846/jcem.2022.16560
Page 278–291
Enhanced teacher-learning based algorithm in real size structural optimization
Abstract 1327 | PDF Downloads 551 | DOI https://doi.org/10.3846/jcem.2022.16387
Page 292–304
Understanding the changes in construction project managers’ competences through resume data mining
Abstract 1956 | PDF Downloads 1045 | DOI https://doi.org/10.3846/jcem.2022.16579
Page 305–319
Automatic safety evaluation and visualization of subway station excavation based on BIM-FEM/FDM integrated technology
Abstract 1573 | PDF Downloads 556 | DOI https://doi.org/10.3846/jcem.2022.16727
Page 320–336
Corrigenda
Corrigendum: Embedded remote group environment through modification in MACBETH - an application of contractor’s selection in construction
Abstract 1091 | PDF Downloads 315 | DOI https://doi.org/10.3846/jcem.2022.16861
Page 337