Vol 25 No 7 (2019)

Published: 2019-07-02

Articles

Page 617-630

Page 654-672

An extended TODIM method for project manager’s competency evaluation

Jielin Yin, Jian Guo, Tianmeng Ji, Jingru Cai, Lei Xiao, Zhao Dong
Abstract 2408 | PDF Downloads 910 | DOI https://doi.org/10.3846/jcem.2019.10521

Page 673-686

A model for evaluating the risk effects on construction project activities

Usama Hamed Issa, Salah Attia Mosaad, Mohamed Salah Hassan
Abstract 1834 | PDF Downloads 1226 | DOI https://doi.org/10.3846/jcem.2019.10531

Page 687-699

Additional stress in soil embankments subjected to a new prestressed reinforcement device

Qishu Zhang, Wuming Leng, Fang Xu, Qi Yang, Xi Ai
Abstract 1084 | PDF Downloads 720 | DOI https://doi.org/10.3846/jcem.2019.10532

Page 700-714

Forecasting of sports fields construction costs aided by ensembles of neural networks

Michał Juszczyk, Krzysztof Zima, Wojciech Lelek
Abstract 1816 | PDF Downloads 1131 | DOI https://doi.org/10.3846/jcem.2019.10534

Page 715-729